Monster Mersey

By skegness 15 entries 27 Apr 2016 — 7 Aug 2016
23Likes
63Comments
Chapter 12 / 15

15 chapters · Page 2 of 2

Monster Mersey

The MERSEY only requires radio gear etc she is done/finished
Liked by Skydive130 and sandkb

finished

Well at last,at least now the MONSTER MERSEY is finished apart from radio gear,it has been a bit of a challenge but worth it in the end,the last picture is the coxswain(ray chapman) not happy with seagull on his boat lol,when I have radio gear etc I will put it on the water and take photos,but in the meanwhile better find the wife and take her to lunch,hope you enjoyed the refurbishment,now to look at another lifeboat for a winter project
Liked by Skydive130 and sandkb

Monster Mersey Interior

Just some basic details of what's inside the cabin of the Mersey,what you see is actually in the real boat
Liked by Skydive130 and sandkb and

monster mersey

Put it on display today for the first time, won't be the last
Liked by Skydive130 and sandkb and
skegness Opening post

Monster Mersey

Put it on display,before I finish off the refurbishment work,still lots of fiddly things to do,but should be ready for the water at nov/dec,good comments all round from the Coxswain/crew & the mayor of Skegness, so now back to the drawing board to get her finished

Delete this post?

It will be removed from the site.

Discard this draft?

Your draft will be deleted and cannot be recovered.

You have an unfinished draft

What would you like to do with it?