Smit Rotterdam 478

By sandkb 24 entries 19 Feb 2017 — 15 Mar 2017
75Likes
18Comments
Chapter 12 / 24

24 chapters · Page 2 of 3

More work on hull exterior.

Final sanding completed of hull. Primer coats and undercoat applied. Ready now for fitting of Rubbing Strips and Fender Strips.
Liked by Brightwork and tonyp and

Wheel House etc.

Working on Wheel House and upper cabin, Radar mast fitted and funnels constructed and installed. Diesel engine exhaust pipes yet to be built and fitted. Wheelhouse interior yet to be built.
Liked by Brightwork and tonyp and

Priming.

Rubbing/fender strips finished, portholes fitted and primer coats applied ready for finish coats to outside of the hull.
Liked by mynewboat and Brightwork and

WheelHouse and Superstructure.

Beginning to add some detail to Wheel House and Superstructure.
Liked by Brightwork and Rod

Wheel House Detail

More detail added to Wheel House.
Liked by Brightwork and Rod and

Upper deck

Making handrails.
Liked by Brightwork and Rod

Delete this post?

It will be removed from the site.

Discard this draft?

Your draft will be deleted and cannot be recovered.

You have an unfinished draft

What would you like to do with it?