Decks commenced
We have made the fore and aft well (cargo) (c) decks and planked and added cabin details. Fore and Poop decks have been made and planked and fixing arranged. We intend both to be movable to assist with transport. The fore and aft Bridge (B) deck has been made and cabins fitted, planking to be done. Both the (A) and Boat decks have been cut and await final shaping and joining as the length was greater than our sheet of plywood. Boat, (A) and (B) decks will be fabricated as one unit, which will lift off the hull, giving easy access to allow installation of ballast. The rear (C) deck is hollow giving good access to the motors and shafts which will help with pond side maintenance. We hope to complete the deck and cabin details shortly. Once complete we will finish the hull plating, install the motors and rudder servo, at which time we can ballast the hulls prior to sea trials. Final fitting out will take some time depending on the detail we decide to show. I have ordered 1000 each of 3mm and 5mm LEDS from China together with some flat warm white LEDS for the walkways.
The models are beginning to resemble the finished article and our work will benefit from this as each part can be seen in its correct location.
Bill and Dave