Converting floor models?
I actually wanted to report on the work yesterday, but the painter is busy in our basement. First the walls, then the entire floor.
During the last renovation, when geothermal probes and a solar system were installed on the roof and a new elevator was installed, certain rooms were needed as storage space for materials.
The short version of my report: I can't get into my little workshop... and it will stay that way until the end of the week!
What that means for a hobbyist like me is obvious! But now to the freighter...
The biggest problem is the deck metal construction and re-drilling the hole for the drive shaft. I think I'll use a movable shaft here. I'm still totally unsure how I'm going to split the deck, as there is a full frame installed every 8 cm (3.15 inches). 🙈🙈🙈
Does anyone have a better idea? Tips are very welcome!
I'll let you know when I can go back downstairs!
Yours, Michel-C.